About "Ten Not Hanging" in the Use of Tower Crane

About "Ten Not Hanging" in the Use of Tower Crane

  Tower cranes are widely used as vertical transportation machinery in construction operations, and have become indispensable construction machinery in construction. As a large-scale construction machine, the analysis has the following characteristics from a safety perspective: 1. It usually has a huge structure and a relatively complicated mechanism, which can complete one lifting movement, one or several horizontal movements.   2. There are many kinds of heavy loads, and the load is variable.   3. It needs to be operated directly in a large range, and the activity space is large.   4. There are many exposed and moving parts, and often come in direct contact with lifting operators (such as hooks, wire ropes, etc.), which has many potential risk factors.   5. Complex operating environment.   6. It is often necessary for multiple people to cooperate to complete an operation.   The existence of many of the above-mentioned risk factors determines that there are many accidents of lifting injuries, and once an accident occurs on the tower crane, not only the property loss but also the personal injury most of the time, the impact is greater, so it has been classified as special equipment management. The manufacturing, installation, use, and maintenance of the company have issued relevant specifications and regulations. The relevant departments or units have summarized the "ten no lifting" regulations for lifting operations as long as they adhere to this "ten no lifting" "In principle, tower crane accidents can be avoided to the greatest extent. However, in the actual production, there is no scientific, specific and practical version of the "ten-no-hang", and there are no special provisions in the relevant specifications of the tower crane. This article attempts to analyze and summarize the various versions of our site and various specifications of tower cranes, and on this basis, put forward specific regulations on the "ten do not hang" tower cranes for your reference.   Now lists the relevant "ten not hang" circulated in our place as follows:   1. The tower crane "Ten No Cranes" in the book "Safety Management System for Construction Sites" issued by Chengdu Safety Supervision and Management Station:   1. Someone staying or walking under the boom and lifting heavy objects is not allowed to hang.   2. The hoisting command should be performed by full-time personnel qualified in technical training. No command or unclear signal is not allowed to hoist.   3. Slender materials and multiple objects such as steel bars, steel bars, pipes, etc. must be tied firmly, and the single-headed "kilogram" or untied strapping is not allowed to hang.   4. Perforated plates, hoppers, and hand-pull dump trucks do not require four-point or large template plug-in plates, and are not allowed to hang when unloading armor cranes. Prefabricated reinforced concrete floor slabs are not allowed to be double-slung.   5. Hanging blocks must use safe and reliable block fixtures. Hanging bricks must use brick cages and be neatly stacked. Wooden bricks, embedded parts and other sporadic objects should be stably stacked with containers.   6. Floor, girders and other hanging objects are not allowed to hang.   7. Sheet piles, well point pipes, etc. buried in the ground, as well as sticking and adhering objects are not allowed to hang.   8. Multi-machine operation should ensure that the distance of lifting heavy objects is not less than 3m. When operating on multiple machines on the same track, it is not allowed to hang without safety measures.   9. Strong winds above level 6 are not allowed to hang.   10. Hanging heavy objects or exceeding mechanical allowable load is not allowed to hang.   The first of the above, "Someone stays or walks under the boom is not allowed to hang". This is definitely unavoidable in the construction site, because when the crane crane rotates, it almost covers the entire site, under the boom. There must be someone who stays or walks; "there is a person who stays or walks under the suspended heavy object and is not allowed to hang" is already contradictory. If it has already been lifted, it is required that it is not allowed to be hung, so this is meaningless. In the fourth article, the hopper is probably a special hopper that is equipped with the tower crane. This must be lifted at four points, but the hand-overturned hopper truck is afraid that it is forbidden to be used for lifting materials, so this article should also be modified; the rest of the articles are only It illustrates some particularities, not completely.   Second, the tower crane "Ten No Cranes" in "Migrant Workers Night School Reader" from Chengdu Safety Supervision and Management Station   1. Overload and oblique pulling are not allowed to hang.   2. The bulk goods are too full or the strapping is not allowed to hang.   3. No command, disorderly command and unclear command signal.   4. The edge of the hanging object is sharp and ther
Time of issue: : 2020-05-05 Number of views : 0
Several factors causing the accident of tower crane

Several factors causing the accident of tower crane

  Due to the particularity and structure of the tower crane, its safety concealment exists in many factors such as installation, use, management, natural environment and so on.   (1) The structure of the tower crane itself   The rigidity, stability and strength of the tower crane steel structure directly affect the safety of the tower crane. Because the crane is subjected to frequent alternating loads during the operation, it is very easy for the steel structure friends to fatigue and break the maple. For example, cracking of the welding seam of the tower crane web, fracture, deformation, and bending of the base material reduce the rigidity, stability, and strength of the structure, cause the steel structure to break thinly, and destroy the local stability of the steel structure. Introduce friends accident.   (2) The quality of electrical systems and institutions   The working mechanism of the tower crane adopts electrical movement and control. The advantages are convenient control, saving cost and low cost. At the same time, electrical components are easy to achieve standardization and generalization, easy to replace and maintain, and easy to realize various safety protections. The working state of the electrical system of the organization determines the reliability, safety and performance of the tower crane. If there is damage or abnormality. It may cause an accident. If the electrical system fails, it can cause shock vibration of the mechanism, resulting in broken shafts and broken teeth and attracting friends. Damaged clutches or brakes or vector control may cause crashes and heavy objects. Aging electrical insulation or broken cabinets may cause electric shock. The failure of various safety devices may lead to accidents such as falling towers, folding arms and falling heavy objects. If the amplitude limit or travel limit is invalid, it may cause a big car or a small car to rush and even derail. The overload limiter and torque limiter fail, and the arm and tower may fall.   The failure of the height limiter may cause the wire rope to overwrap into broken rope and fall accidents of heavy objects. Phase sequence protection vector rescue, in the case of wrong phase and broken phase. It may cause disorder of operation instructions and cause accidents.   (3) Human factors   In many tower crane accidents. Most accidents are due to user violations or misuses. The two accidents mentioned below also have elements of illegal operations.   A non-driver of a certain unit does not ring the bell to drive. As a result, the extravagant workers on the track were crushed. When the installation team of a machinery construction company inspected the TQSOB tower crane, in order to replace the boom puller, it was prepared to remove the balance weight first and then replace the pull plate pin to connect the boom and the lifting rope together , And then use the car to lift the boom. Open the boom pull plate pin. When lowering the boom, the backward tilting moment due to the balance weight is very large, causing the tower crane to lose its balance and causing the balance arm and the tower tip to fall together.   Accident during disassembly. Due to the high weight of the metal structure of the tower body, the disassembly and assembly of the tower crane is a high-altitude operation, which is dangerous and technical. Among the tower crane accidents, the accidents during the disassembly and assembly account for a considerable proportion, and they are relatively large accidents. Some tower cranes are not disassembled by professional installation teams but by non-professionals. Due to the low quality of the installation personnel, the ability to prepare installation plans, the ability to select schemes and mechanical calculations, and the ability to formulate scientific disassembly and assembly, so that new problems or special problems in the operation process cannot be solved, something happened   is inevitable. The quality of some installations is substandard, leaving hidden dangers.   Improper management. Insufficient training of the staff, insufficient understanding and implementation of various rules and regulations, and insufficient management of the work site have all laid hidden dangers for the accident. Some enterprises have unsound systems and staff have no rules to follow, so they have to rely on personal experience to operate and are prone to making mistakes. Some enterprises do not implement special personnel planes. In addition, different factory models have different operation handles. Therefore, it is possible for the driver to make mistakes; some work sites temporarily combine some staff for work needs, making it difficult for the commander, driver, and rigger to achieve   The industry is coordinated, and some non-professionals or leaders temporarily act as operating personnel, which will inevitably lead to errors and accidents; some companies do not pay attention to maintenance management and fail to eli
Time of issue: : 2020-02-04 Number of views : 0
Maintenance of slewing bearing device of tower crane

Maintenance of slewing bearing device of tower crane

  (1) The mounting support of the slewing bearing (the seat supporting the bottom surface of the ring gear and the seat placed on the upper surface of the inner ring) must have sufficient rigidity, and the mounting surface should be flat. Before assembling the slewing bearing, the bearing should be stress-relieved to reduce the deformation of the slewing bearing. The contact surface of the bearing and the slewing bearing must be cleaned up during assembly.   (2) Pay attention to the change of noise and the change of rotation resistance torque during use, and disassemble and inspect if there is any abnormal phenomenon.   (3) The slewing bearing must be lifted or stored horizontally. Do not lift or store it vertically to avoid deformation.   (4) Before the bolts are fully tightened, the gear meshing inspection should be performed, and the meshing condition should meet the requirements of gear accuracy: that is, the contact spots distributed on the tooth surface of the gear pair after running under slight braking are in the height direction of the gear teeth Not less than 25%, not less than 30% in the length direction of gear teeth.   (5) The debris should be removed once for 10 shifts of tooth surface work, and re-applied with grease.   (6) In order to ensure the reliability of the bolt work and avoid the insufficient preload of the bolt, the preload torque of the bolt should be checked separately after the first 100 hours and 500 hours of the slewing bearing work. The pre-tightening torque should be checked every 1000 hours thereafter.   (7) High-strength bolts and nuts are used for bolts and nuts connected to the slewing bearing; double nuts are used for fastening and anti-loosening.   (8) When tightening the nut, the thread of the bolt and the end surface of the nut should be coated with lubricating oil, and should be tightened with a torque wrench symmetrically and evenly in the circumferential direction multiple times. During the last tightening, the pre-tightening torque on each bolt should be approximately uniform.   (9) Four oil cups are evenly distributed on the upper surface of the slewing ring gear aligned with the raceway, thereby adding grease to the raceway. Under normal circumstances, the slewing bearing is lubricated once every 50 hours. Each time you add oil, you must add enough oil until grease leaks from the seal.
Time of issue: : 2020-01-07 Number of views : 0
Who controls the tower crane-the dialogue between the enterprise and the management department

Who controls the tower crane-the dialogue between the enterprise and the management department

  In view of the chaotic situation in the production, supply, marketing and use of tower cranes, some formal enterprises have put forward their own suggestions.   Xia Chunting, member of the Standing Committee of the CPPCC Provincial Committee and chairman of Huaxia Group, discussed his views. His suggestion is to use the new certificate replacement opportunity next year to revoke the production licenses of a number of manufacturers who no longer have the production conditions. For enterprises that want to join the tower crane production industry, can they implement the practice of first obtaining a license and then obtaining a business license as they are for pharmaceutical companies.   It is understood that the production license for tower cranes will be changed every 5 years. Now the licenses for the whole country have expired last year, and the country wants to start the license renewal work next year.   Regarding this suggestion, Liu Hongsheng, director of the Production Licensing Department of the General Administration of Quality Supervision, Inspection and Quarantine, said in an interview with our reporter on September 24 that the General Administration of Quality Supervision, Inspection and Quarantine will start the work of renewal of licenses next year. It is responsible for organizing experts to compile the implementation rules for certificate replacement. For an enterprise applying for certificate issuance, experts will be organized to visit according to the rules, and new certificates will be obtained after they are qualified. Director Liu said that after the completion of the certificate replacement, the National Bureau will organize a nationwide rectification campaign against unlicensed enterprises. Wu Jianping, director of the Production Licensing Office of the General Administration of Quality Supervision, Inspection and Quarantine, added that companies may be fraudulent in order to obtain certification, and once found, they will be revoked forever.   Some companies suggested that the annual inspection and supervision system of tower cranes should be strictly used to strengthen the management of operators.   It is understood that the operating risk of the tower crane is higher than that of cars driving on the road. The annual inspection and scrapping system of the car and the qualification examination of the driver are extremely strict, but the tower crane is not the case. The annual inspection is a form, and some regions have also developed cross-departmental management Chaotic situation. In addition, nearly half of the tower crane accidents occurred during installation or disassembly. The main reason for such accidents is the low quality of the installers and operators. People who do not have the operation license of the tower crane driver also open the tower crane without strict management.   On September 24, Cui Gang, the director of the Special Equipment Division of the AQSIQ Boiler Bureau, told reporters that in the past, there was indeed a cross-management situation of "no one cares, no one cares". status. He said that the State Council has clearly stipulated once again in the three plans issued by the State Administration of Quality Supervision, Inspection and Quarantine in August this year that the annual inspection of tower cranes and the security inspection of newly installed tower cranes and the training of operating personnel will be conducted by the post. The organization of the quality inspection system and other administrative departments shall not interfere. Cui Gang said that from October 1 this year, the quality inspection system will enter the security inspection link of the tower crane in force, and strict training and certification of driver personnel.   From July 1, 2001, the use of 20D derrick tower cranes is prohibited, because this type of simple tower cranes produced in large quantities in the early 1990s has great hidden dangers. It was suggested that the whole country should also promote the practice. Regarding the 20D derrick tower crane, if there are indeed serious safety hazards, the relevant experts should consider this issue when preparing the implementation rules for the certificate replacement and put forward the proposal of "national cut-off".   Xia Chunting also suggested that, from the perspective of safety performance, the country should promote basic tower cranes to minimize or even prohibit the two types of heavy-duty and walking cranes.   For this suggestion, Director Liu Hongsheng said that we will fully consider how to strengthen the safety performance requirements of heavy-duty and walk-over tower cranes in the implementation rules for certificate renewal, but the comprehensive ban of these two types of products must be coordinated by other departments of the State Council.
Time of issue: : 2019-07-07 Number of views : 0
Several problems that should be paid attention to in the demolition of tower crane

Several problems that should be paid attention to in the demolition of tower crane

  With the gradual development of construction projects towards the direction of short-term construction, the demolition of tower cranes in construction is becoming more and more frequent, and assembly and disassembly have become a very important work link. Based on ten years of work experience, the author discusses several issues that should be paid attention to during the demolition of tower cranes, so as to improve together.   1 Installation site selection   Under the premise that the tower model has been selected, the installation site selection should handle the following items: ① one-time installation can complete the overall project construction, avoid secondary displacement; ② avoid dead corners on the construction plane; ③ fixed attachment points It is convenient to choose and install; ④ the tower crane is easily disassembled and transported during construction; ⑤ avoid its sub-buildings, high-voltage power grids, etc. in the construction space; ⑥ help to install other equipment and lift building components according to construction needs.   2 Personnel organization   Tower crane assembly and disassembly is an important, dangerous, and intensive three-dimensional operation project, which must be highly valued from the ideology and fully guaranteed from the organization. In addition to the necessary construction management and professional technical personnel, all construction workers should undergo professional education, have the corresponding work safety knowledge, operation skills, and hold a certificate to work. Tower crane assembly and disassembly should be carried out by a professional construction team.   3 Discuss the demolition of construction equipment and equipment preparation   3.1 Issues to be noted   The migration of tower cranes generally involves disassembly, transportation, installation and other links. The equipment and machinery must be carefully organized and arranged to ensure safety and improve efficiency and economic benefits. It should be noted that: ① all lifting installation equipment should not only be used for large materials, but also not allowed to use overload capacity; ② transportation equipment should be arranged according to the quality and shape of each part of the tower crane, and try to avoid super long, super high, super wide, and heavy transport ; ③ Try to use the construction method of disassembling, loading and transporting, and installing at the same time to avoid secondary backhaul or occupying the undesirable construction site; ④ The site should be equipped with workers or ambulances, and high-altitude operations must be equipped with necessary communication tools Favorable for safe operation and normal construction.   3.2 Selection of lifting slings   Tower crane assembly and disassembly should generally be equipped with white hemp rope or nylon rope, various specifications of steel wire rope sleeves, steel cables, a certain number of 8# iron wires and special tools. These tools have sufficient allowable tensile force and safety factor. Different performance spreaders and rigging must be used and scrapped according to the corresponding standards.   3.3 Inventory and preparation of equipment parts   Phenomenon such as missing parts and few parts influencing the progress in construction are not uncommon. In order to ensure the construction progress, the above parts should be strengthened, managed, inspected and repaired; small parts and spare parts for equipment; special, general bolts, mother, pad; various specifications and Number of coupling pins and shafts; special tools for equipment assembly and disassembly; trimming tools for damage and deformation of some structural parts; wire rope clamps, rope loops, etc.   4 Tower crane foundation   Before installing the tower crane, you must ensure that it has a correct and intact foundation. The foundation of the tower crane is two types: fixed base and track walking. The following issues should be noted.   1) The foundation ground bearing capacity is the foundation foundation, and the necessary measures should be taken to ensure that the ground bearing capacity is 10-20t/m2. It can be constructed by tamping or compacting with 3:7 lime soil. Never use backfill soil and garbage without directly treating it as a base or rail.   2) The fixed base should be constructed according to the design requirements, to ensure that the size of each part, especially the embedded bolts, etc., must meet the size requirements from the foundation center to the building for building construction and attachment installation.   3) The track foundation should be constructed according to the design requirements, to ensure the technical requirements of the thickness of the gravel, the width of the subgrade, the spacing of the sleepers, the type of rails, rail joints, connecting rods, car stops, grounding, etc.   4) Under the foundation of the tower crane, there should be no hidden trenches, shelters, etc., and necessar
Time of issue: : 2019-06-02 Number of views : 0
Basic requirements and safety points for tower crane operation and maintenance

Basic requirements and safety points for tower crane operation and maintenance

  Tower cranes are large products and products with high safety requirements. It is not easy for construction companies to buy a tower crane. Therefore, it is of great significance to correctly grasp the knowledge of use and maintenance, avoid accidents, and extend the service life of machinery. Whether a tower crane works well or not depends on design quality and production quality. However, the tower cranes of the same type have different functions and benefits in different users' hands, which can be very different. This fully shows that users use and maintain well, which plays a decisive role in the loss of equipment.   Section 1 Basic requirements for user use, maintenance and management   Tower crane users should use, maintain and manage:   (1) Users should establish management files for tower cranes. Including the instruction manual, delivery list, spare parts, installation handover records, etc. entered into the construction unit, which can be checked.   (2) It is necessary to formulate a tower crane maintenance system and strictly implement it. It is required that the equipment management personnel can understand the operation status of their tower cranes, whether there have been any faults, and whether they have been handled properly. And there are records.   (3) Correctly handle the relationship between use and maintenance, not just re-use and relax maintenance. In fact, good maintenance can greatly improve the use efficiency and reduce accident losses.   (4) It is necessary to provide technical training for operators, strengthen the education of basic knowledge of use, maintenance and maintenance, cultivate them to consciously care for the habits and atmosphere of mechanical equipment, master basic skills and skills, and strictly abide by the operating regulations. Unlicensed personnel are prohibited from taking up positions.   (5) Prepare necessary material conditions to meet the needs of maintenance work. Such as oil pot, grease gun, oil cup, funnel and special]: with equipment, provide cotton yarn and lubricating oil according to the quantity on schedule, and supply the necessary spare parts and accessories on time.   (6) Under special construction conditions, to change the installation and construction conditions of the tower crane, you must get in touch with and negotiate with the supplier, and you can't make changes with self-righteousness. If necessary, you must consult the design unit and professionals.   (7) Create the necessary environmental conditions for the normal use of the tower crane, such as construction space to avoid collision, lighting, power supply environment, waterproof immersion, etc. For the operators, provide comfortable and convenient working conditions as much as possible, pay attention to cooling and heating, reduce their fatigue and distract attention.   Section 2 Basic safety awareness that operators should have   A tower crane, whether the use of the factory is correct, whether the maintenance is thoughtful and effective, the key is the operator. The operator must clearly realize that he owns not only a large-scale equipment, but also the life safety of himself and some people on the construction site. The responsibility is very heavy. Must be careful at all times. As an operator, it must be deeply understood that the most terrible thing about tower cranes is the inverted tower, followed by collisions and damage to the mechanism. Therefore, every effort should be made to prevent the tower crane from losing its balance, preventing collision, and preventing overload.   1. Excessive torque is the root cause of tower collapse   Operators must absolutely prevent excessive torque. There are some reasons for the excessive torque, which should be highly noticed by the operator:   (1) Use when the torque limiter fails or is not adjusted properly. The torque limiter operates only when it exceeds the torque, and usually does not operate. At the same time, it often does not attract attention. The operator should check it consciously at ordinary times. Press the contact of the upward switch of the pressure limiter to see if the alarm ring still sounds. The sound proves that it can operate normally. If it does not sound, it proves to be a fault, and it should be repaired before operation. As for use without adjustment, it is a serious violation of the regulations and very dangerous. It is best to install a torque indicator so that you can know what the lifting moment is and how far it is from the dangerous situation. The operator should refuse to operate the tower crane when the torque limiter is abnormal.   (1) Pull it horizontally and diagonally. The tower crane is forbidden to lift diagonally. However, it is difficult to lift the crane completely vertically on the construction site. Generally, when calculating, the horizontal force of the factory sling inclined by 3° (tan3°=5%) is considered. The horizontal component force is 5%, but the generated torque is not
Time of issue: : 2019-03-02 Number of views : 0
Previous page
1
2

Industry Dynamic

There is currently no information to display
Please add data record on website background.

Hot Products

Shandong Huaxia tower crane

Shandong Huaxia tower crane

Shandong Huaxia tower crane, registered and established in Shandong / Weihai City in 1985, is now relocated to Linyi. Our company operates tower cranes in the mode of production and processing; Piling machine; Mixing station; Construction elevator; Tower crane, the processing method is incoming processing, the processing technology is machining, other mechanical hardware technology, assembly, and the service field is machinery; Hardware has more than 1000 employees and a registered capital of 90 million yuan. If you are interested in our products, technology or services, you are welcome to call or come to consult at any time.
Linyi Huaxia heavy industry

Linyi Huaxia heavy industry

Linyi Huaxia heavy industry mainly deals in Huaxia tower crane, QTd, QTP, QTZ, tower crane, elevator, tower crane, material machine and other products. Linyi Huaxia heavy industry of company independently develops hydraulic jack up tower crane, flat head tower crane, tower crane, QTd and other products with 8 technical patents. A good product (QTd tower crane, QTP elevator,Linyi Huaxia heavy industry ) is like a perfect movement, which requires our wholehearted investment, From raw material purchase to semi-finished product processing and later quality inspection All of them embody our painstaking efforts.
Huaxia tower crane

Huaxia tower crane

The special page of Huaxia tower crane provides you with the product information of various crane types and accessories of Huaxia tower crane, including the price, pictures and other information of Huaxia tower crane, which helps you choose better Huaxia tower crane products. Huaxia tower crane provides enterprises with product information of various crane types and applicable objects of accessories, including Huaxia tower crane price, pictures and other information, here to help you choose better Huaxia tower crane products.
5015 tower crane

5015 tower crane

5015 Tower crane is the most commonly used lifting equipment on construction sites. The extension (height) of each section (hereinafter referred to as "standard section"). It is used to lift construction raw materials such as steel bars, wooden beams, concrete and steel pipes. The function of the 5015 Tower crane is to bear the upper load transmitted by the jib pull rope and the balance arm pull rope, and directly transmit 5015 Tower crane to the tower structure through the rotary tower, turntable, bearing seat and other structural components. 5015 Tower crane ;50 represents the boom length of 50 meters, and 15 represents the maximum lifting capacity of the boom tip of 1.5 tons.
QTZ250 (7030) tower crane

QTZ250 (7030) tower crane

Model QTZ250 (7030) tower crane with lifting torque of 250tm.Tower crane: the boom form of tower crane is divided into horizontal type and pressure bar type. When the boom is horizontal, the truck runs along the horizontal boom and the luffing motion is balanced. The boom is long, but the boom weight is large. When the boom is of compression bar type, the luffing mechanism leads the boom to pitch luffing. The luffing motion is not as stable as the horizontal type, but its self weight is small. The lifting capacity of the tower crane varies with the amplitude. The product of lifting capacity and amplitude is called load moment, which is the main technical parameter of this crane. Through the slewing mechanism and slewing ring, the tower crane has large lifting height and large inertia mass of slewing and walking, so it needs to have good speed regulation performance. In particular, the lifting mechanism is required to be fast under light load, slow under heavy load and micro motion in place. Generally, in addition to resistance speed regulation, eddy current brake, frequency modulation, pole changing, thyristor and electromechanical combination are often used for speed regulation.
QTZ40 tower crane

QTZ40 tower crane

QTZ40 tower crane is a new type of tower crane for construction. The machine is in the form of horizontal boom, trolley luffing and upward rotary hydraulic jacking; The working range is 45m-2m; The lifting capacity is 4T at quadruple rate and 2T at double rate; The rated lifting moment is 400kN m; The lifting height is 35m for independent use and 100m for attached use.     

Contact Us

Outgoing telephone:0539-6015699/0631-5982999

Huaxia Heavy Industry:+86-0539-6015699(Domestic)

After-sales service:+86-0631-5980999/5982299

Hotline Fax:

+86-0631-5987519(Domestic)

+86-0631-5999076(Foreign)

Corporate Mailbox:huaxia12007@163.com

Company Address:Huaxia Road, Weihai, Shandong Province

Linyi huaxia:0086-0539-6015699

Technical consulting:0086-0631-5986868

Accessories sales:0086-0631-5999018

Anti-fake Supervision:0086-0631-5993999

Zip Code:264205

huaxia

follow Wechat

huaxia

本网站支持IPv6访问 Shandong Huaxia Group Co.,LTD

Tel

Weixin

TOP