Before the Huaxia tower crane enters the site, if it is necessary to purchase new equipment, it must check the manufacturer and select the equipment generally reflected by the society. The equipment must have no design defects, such as small sports cars without anti-tilting devices, lifting pulleys without anti-falling devices, lifting winches without couplings and other design defects, causing accidents. At the same time, it is necessary to ensure that the instructions, certificates and production licenses are complete.
Let's talk about itHuaxia tower craneMeasures need to be taken to ensure its use
In recent years, Huaxia tower crane sometimes has accidents, so when using the equipment, we must ensure the use of measures. Due to the long space, the following will introduce safety measures.
1. Before entering the market, if Huaxia tower crane needs to purchase new equipment, it is necessary to check the manufacturer and select the equipment generally reflected by the society. The equipment must be free from design defects, such as small sports cars without anti-tilting devices, lifting pulleys without anti-falling devices, lifting winches without couplings and other design defects, causing accidents. At the same time, it is necessary to ensure that the instructions, certificates and production licenses are complete.
2. Tower crane rental equipment must have complete procedures, such as instruction manual, certificate of approval, product production license, etc. Before entering the site, it is necessary to strictly check whether the safety devices are complete, whether the steel structure is corroded, cracked or welded, whether the transmission pulley meets the use requirements, whether the wear meets the scrap conditions, whether the luffing, turning and lifting systems must be put into on-site trial operation, must meet the trial operation requirements, must be strictly accepted, and mixed bid sections are strictly prohibited, on-site inspection certificate issued by the property right unit.
3.Huaxia tower craneThe management of mobilization, installation and removal shall be carried out by qualified hoisting teams. Before entering the construction site, the general situation of the construction environment shall be understood and implemented. The surrounding roads, high-voltage lines and original buildings must be well-known. The technical director shall prepare the installation and removal plan of tower crane.
4. A cordon shall be set up according to the site conditions to prevent irrelevant personnel from entering, make full use of the "Three Treasures" to organize installation and disassembly personnel to understand the performance of the equipment, and make installation safety technical disclosure to the installation and disassembly personnel. It shall be subject to the supervision of the safety officer and supervision unit on the construction site. It is forbidden to wear shoes that are easy to nail. Anti-skid and anti-freezing measures shall be taken in winter, in the operation process, there must be a special person responsible for the command, equipped with armbands and uniform staff dress.
5. The operation of Huaxia tower crane shall be carried out in strict accordance with the relevant requirements of the instructions and operating procedures. Hoisting operations are strictly prohibited for strong winds above level 4. The installation of wall anchorages shall also be carried out in accordance with the requirements of the specifications and installation scheme.
The following continues to ensure that the useHuaxia tower craneRequired measures.
6. After the installation of the Huaxia tower crane is completed, the wiring debugging shall be carried out in accordance with the requirements of the instruction manual. All safety limit devices must be tested and a wiring debugging certificate must be issued.
7. After the installation of Huaxia tower crane is completed, it shall be jointly accepted by the construction unit, installation and demolition unit, property right unit and supervision unit, and signed and sealed. After the tower is tested by a qualified technical supervision department and issued a qualified inspection report, the construction unit must report to the local construction administrative department for the record.
8. After the equipment is officially put into use, the construction unit shall use the operation certificate issued by the provincial construction engineering administration bureau or the labor department, which shall be managed and registered by the equipment management department in a unified way. During the work, handover records and daily maintenance records shall be carefully made. It is strictly prohibited to operate faulty equipment, rest for idle people, accelerate equipment wear and fatigue, dismantle various safety devices without authorization, and find out the cause in time when the safety device alarms in operation.